Project Snapshot (at a glance):

Existing Pipe:

6-inch steel

New Pipe:

8-inch PI

Length Installed:

~5,000 LF

Environment:

Major highway corridor

Project Highlight:

In advance of VDOT’s planned widening of Route 17, Ross & Sons was selected to relocate and renew an existing pipeline along one of the region’s busiest highways. The project involves replacing a 6-inch steel line with nearly 5,000 linear feet of new 8-inch PI pipe. With high traffic volumes and complex coordination requirements, the work requires careful planning and a safety-first approach to ensure minimal disruption while preparing the gas infrastructure for upcoming roadway improvements.

Excavator digging trench along roadside for pipeline work

Project Outcome:

Infrastructure relocated ahead of future road construction

Increased capacity with upgraded pipe size

Reduced risk of conflicts during VDOT widening

Photo Gallery

Pipeline secured with sandbags during installation process
Excavator placing pipeline into trench
Pipeline alignment and trench work near roadway
Pipeline installed inside deep trench for utility project
Close-up of drilling machine controls for pipeline installation
Construction supervisor overseeing pipeline installation work
Pipeline laid across construction site before installation

Ready to work with us?

Contact Us

More Projects