Excavator loading materials into truck

Project Snapshot:

Pipe Size:

8-inch steel

Length Installed:

~700 LF

Environment:

Active rail corridor

Primary Goal:

Risk mitigation & infrastructure protection

Project Highlight:

To reduce long-term risk to critical gas infrastructure near an active railway, Ross & Sons relocated an existing 8-inch steel main to a deeper, more secure alignment. The previous location left the line vulnerable to vibration, surface activity, and future rail improvements.

Working within an active rail corridor, our team safely installed approximately 700 linear feet of new steel pipe while maintaining strict safety standards and coordination requirements. The project was completed efficiently with no service interruptions, significantly improving the durability and protection of the gas system.

A JCB trenching for the utility pipe installation

Project Outcome:

Enhanced infrastructure protection

Reduced future maintenance risk

Safe execution in a high-traffic corridor

Photo Gallery

Two utility pipelines in the road side in Holland Road
Two cars are parked and when flashing board in the road
Pipeline installation and ladder at the underground
Close-up picture of large pipeline joint connection and other pipe
Heavy vehicles at utility pipeline installation place
A Yellow JCB trenching for the utility pipe installation

Ready to work with us?

Contact Us

More Projects