Project Snapshot:
Pipe Size:
8-inch steel
Length Installed:
~700 LF
Environment:
Active rail corridor
Primary Goal:
Risk mitigation & infrastructure protection
Project Highlight:
To reduce long-term risk to critical gas infrastructure near an active railway, Ross & Sons relocated an existing 8-inch steel main to a deeper, more secure alignment. The previous location left the line vulnerable to vibration, surface activity, and future rail improvements.
Working within an active rail corridor, our team safely installed approximately 700 linear feet of new steel pipe while maintaining strict safety standards and coordination requirements. The project was completed efficiently with no service interruptions, significantly improving the durability and protection of the gas system.