Close-up of pipe weld joint

Project Snapshot (at a glance):

Pipe Installed:

16-inch steel transmission & MDPE (various sizes)

Key Work Elements:

Utility relocation, valve repair, regulator stations

Environment:

Mixed utility corridor

Primary Goal:

Completing and integrating partially finished infrastructure

Project Highlight:

The Mitchell Point project was initially started by another contractor, and Ross & Sons was brought in to complete the remaining work. Our team performed utility crossing relocation, valve repair, and the installation of multiple sections of 16-inch steel transmission pipeline. In addition, we installed various sizes of MDPE pipe and set regulator stations to ensure the system was properly integrated. The project was completed efficiently, resulting in a seamless transition and fully functional transmission and distribution infrastructure.

A worker repairing the utility pipe

Project Outcome:

Successful completion of a partially finished project

Upgraded transmission and distribution systems

Improved system integration and reliability

Safe, coordinated execution across multiple scopes

Photo Gallery

A worker repairing the utility pipe
Three worker at underground pipeline work
Close-up view of large pipeline joint connection
Close-up of large pipeline joint connection
Pipeline joint installation by ross and utility

Ready to work with us?

Contact Us

More Projects