Construction equipment working alongside protected trench area

Project Snapshot (at a glance):

Installation Method:

Bore

Length Installed:

~1,080 LF

Average Depth:

Just over 16 feet

Environment:

Exposed crossing

Project Highlight:

Grade changes over time left an existing gas line with insufficient cover, increasing the risk of damage at an exposed crossing. Ross & Sons replaced the at-risk segment with a new bored installation, installing approximately 1,080 feet of new gas main at a consistent depth of just over 16 feet. The work was completed while maintaining strict safety standards and protecting adjacent infrastructure, resulting in a properly covered crossing and a system prepared for future site conditions.

Heavy-duty track mats placed over trench for equipment access

Project Outcome:

Eliminated exposure risk at the crossing

Improved depth consistency and protection

Safe installation near existing infrastructure

Increased long-term system reliability

Photo Gallery

Exposed underground pipe during utility repair work
Water pipeline valve installation inside trench
Roadside trench excavation for utility pipeline installation
Pipeline running along roadside utility corridor
Concrete road cutting for underground utility repair work
Heavy-duty track mats placed over trench for equipment access
Backfilled trench for underground utility pipeline installation